
Panel upgrades in Canoga Park
Original panels in 1950s houses, and meter-bank and house-panel replacements for apartment owners, filed on whichever LADWP track the building belongs on.
Licensed electricians for Canoga Park houses, apartment buildings, Sherman Way storefronts and Canoga Avenue shops, with free estimates on eligible work.
Small repairs welcome · Free estimates on eligible work · Licensed C-10 #1100231Call (844) 430-7681
Canoga Park is the oldest town center in the west Valley. It began as Owensmouth in 1912, and the blocks around Sherman Way and Owensmouth Avenue still hold commercial buildings from the 1910s and 20s; Main Street Canoga Park, the historic downtown, is the neighborhood's hub again. Most of the housing around it came with the post-war boom of the 1950s and 60s.
Nearly two-thirds of households here rent, so alongside panel upgrades and chargers for owners, we also work for landlords and property managers, and for the shops and light industry along Sherman Way and Canoga Avenue. The estimate is on site and the price is in writing.
Everything we do in Canoga Park, with what each job usually involves here. The photos are from our own jobs.

Original panels in 1950s houses, and meter-bank and house-panel replacements for apartment owners, filed on whichever LADWP track the building belongs on.

Chargers in garages and driveways, and for apartment owners in assigned parking where the building's service has room for them.

Dead circuits in storefronts that have had a string of tenants, and faults in wiring extended since the 1950s.
More on electrical repair & troubleshootingCall (844) 430-7681

Room-by-room rewiring of post-war houses and older multi-unit buildings, including the patched wiring common in the blocks around Sherman Way.

Storefront lighting on Main Street Canoga Park, parking-lot and security lighting for apartment buildings, and recessed lighting for remodels.

Tenant improvements in the 1910s–20s buildings around Sherman Way and Owensmouth, and three-phase circuits, machine feeders and service upgrades for the workshops along Canoga Avenue.
Also: subpanels, dedicated circuits, 240-volt outlets for dryers and ranges, exterior and security lighting, hard-wired smoke alarms, and small repairs of every kind.
Need an electrician in Canoga Park? Call now, or send the form and we'll call you back to set a time for an on-site estimate.
Call (844) 430-7681Request an estimateAreas we cover in Canoga Park
Good to know
4.9★ from 232 Google reviews across our service area · Licensed C-10 #1100231 · Free estimates on eligible work
Three kinds of buildings make up most of the electrical work in Canoga Park: post-war houses, rented multi-unit property, and the commercial and industrial strip that grew up along the old rail line.
Canoga Park's ZIP codes (91303, 91304) are City of Los Angeles addresses throughout; 91304 carries on west into West Hills, which is city too. What sets a job here apart is the building. Apartment buildings, storefronts and shops don't use the online request that covers a house: LADWP handles their service changes as commercial work, which means more paperwork and more lead time, and we plan for both from the first visit.
On a fourplex or a courtyard building, a service upgrade usually means a new meter bank, and every unit is off on the day LADWP disconnects and reconnects. We fix that date with the owner well ahead so tenants can be told.
Permits come from the Los Angeles Department of Building and Safety (LADBS). A new circuit, an EV charger, a sub-panel or a panel replacement is permitted work, and LADBS will not send an inspector until the permit is issued. We pull it under our license and meet the inspector at the end.
Power comes from the Los Angeles Department of Water and Power (LADWP), not Southern California Edison. For repairs, lighting, new outlets and a charger that fits on the existing panel, LADWP is not involved. For a panel or service upgrade it is: the job starts with LADWP's free meter spot, where an Electric Service Representative visits within five to fifteen business days, confirms where the new equipment may go and leaves a sketch at the job (single-family services up to 320 amps can be requested online). When only the meter needs setting, LADWP says that generally happens within ten working days. If the existing LADWP service can carry the new load there are generally no LADWP charges; work in the street, on a transformer or on the lines can add cost and time, and we find that out before you commit.
The permits and utilities guide explains the whole picture for the three counties we serve.
Woodland Hills, West Hills, Chatsworth and Winnetka border Canoga Park, and Reseda and Tarzana are a few minutes east; all six are City of Los Angeles neighborhoods with LADBS permits and LADWP power. Hidden Hills, a short drive southwest past West Hills, is a gated city with its own building department and Southern California Edison power.
See the full list of areas we cover across Los Angeles, Orange and Ventura counties.




No phone quotes and no guessing. A written estimate after we've seen the job, then permitted, inspected work.
Call or send the form. A photo of the panel or the problem helps us come prepared.
We come to your home or business and look at the panel, wiring or site.
Scope, price and timeline in writing before you decide anything.
We pull the permit, coordinate your utility when needed, and finish with the inspection.
The electrical service, and what the last few tenants left behind, before you sign. These blocks hold the oldest commercial buildings in the west Valley, from the 1910s and 20s, and their wiring has been patched for a century; a restaurant or a salon can need more capacity than the space has. We look at the panel, the meter and the existing circuits on a site visit and tell you whether your use fits or what it would take. The work itself is an LADBS tenant-improvement permit under the building's service.
No. A house goes through LADWP's online request, but a multi-unit building is handled as a commercial service: single-phase up to 400 amps through LADWP's small commercial submittal, and anything larger or three-phase through a full electric service request with a site plan, load schedule and one-line drawing. LADWP asks you to allow six to eight weeks for its service planning engineer to work out the cost. We give you the timeline in writing.
It depends on what the building already has, so we check the meter and the main switch on the site visit, ideally before you sign the lease. If there's no three-phase service, or it's too small for your machines, it becomes an LADWP electric service request, and it's worth knowing LADWP's cost and timing before you commit. If the service is already there, it's a tenant-improvement permit for the feeders and circuits your equipment needs.
Call now, or send the form and we'll call you back to schedule an on-site estimate.