Los Angeles County · a neighborhood of the City of Los Angeles

Electrician in Granada Hills

Licensed electricians for Granada Hills, from the 1950s tracts to the Eichler houses of Balboa Highlands and the horse lots above Rinaldi Street, with free estimates on eligible work.

What you can call us for in Granada Hills

Small repairs welcome · Free estimates on eligible work · Licensed C-10 #1100231Call (844) 430-7681

Most of Granada Hills was built in the 1950s, when the orchards became tracts, and most of it is owner-occupied, so the usual job is a long-term owner bringing a sixty-year-old house up to date. Two areas set it apart. Balboa Highlands is the only Joseph Eichler tract in Los Angeles County: 108 mid-century modern houses from 1962 to 1964, protected since 2010 as a Historic Preservation Overlay Zone. North of Rinaldi Street, the Granada Hills Equinekeeping District allows horses on large lots that back onto the Santa Susana foothills.

Both change how the work is done. In Balboa Highlands the preservation plan says where electrical masts and panels should go; north of Rinaldi the lots are in the fire zone and carry barns and outbuildings. We come from the Reseda area, the estimate is on site, and the price is in writing before work starts.

What we do in Granada Hills

Everything we do in Granada Hills, with what each job usually involves here. The photos are from our own jobs.

Service upgrade in progress: new meter main and conduit
Service upgrade in progress: new meter main and conduit

Panel upgrades in Granada Hills

Service upgrades for 1950s houses, and in Balboa Highlands a panel placed at the rear to the preservation plan, with the HPOZ clearance in hand before the LADBS permit.

Tesla Wall Connector, garage install
Tesla Wall Connector, garage install

EV charger installation in Granada Hills

Level 2 chargers in garages and carports, with the HPOZ review in mind for an Eichler and a load calculation first on any 1950s service.

New construction rough-in: panel set and circuits run before drywall
New construction rough-in: panel set and circuits run before drywall

Rewiring in Granada Hills

Replacing original 1950s wiring and the patched work of decades of additions; in an Eichler, routed to respect the exposed structure.

Single pendant hung in a two-story stairwell with recessed lighting
Single pendant hung in a two-story stairwell with recessed lighting

Lighting & ceiling fans in Granada Hills

Landscape and security lighting on hillside and horse lots, and in Balboa Highlands exterior lighting placed where the preservation plan exempts it from review.

Outdoor GFCI outlet in a weatherproof box, cover open, fed by conduit
Outdoor GFCI outlet in a weatherproof box, cover open, fed by conduit

Outlets, GFCI & new circuits in Granada Hills

GFCI protection for pools, spas, barns and outdoor areas, and 240-volt circuits for spas, pumps and dryers.

Four-unit meter stack for a multi-family building
Four-unit meter stack for a multi-family building

Commercial electrical in Granada Hills

Tenant improvements, lighting, meter banks, dedicated circuits and service upgrades for shops, offices, warehouses and multi-unit buildings.

Also: subpanels, dedicated circuits, 240-volt outlets for dryers and ranges, exterior and security lighting, hard-wired smoke alarms, and small repairs of every kind.

Need an electrician in Granada Hills? Call now, or send the form and we'll call you back to set a time for an on-site estimate.

Call (844) 430-7681Request an estimate
Granada Hills at a glance
ZIP codes
91344
Jurisdiction
A neighborhood of the City of Los Angeles, Los Angeles County

Areas we cover in Granada Hills

  • Balboa Highlands
  • Knollwood
  • Old Granada Hills
  • North of Rinaldi Street
  • Chatsworth Street
  • O'Melveny Park area

Good to know

  • Inside the City of Los Angeles; most homes built in the 1950s
  • Balboa Highlands: 108 Eichler houses in a historic overlay zone
  • Horse lots and the fire zone north of Rinaldi Street
  • About three in four homes are owner-occupied

4.9★ from 232 Google reviews across our service area · Licensed C-10 #1100231 · Free estimates on eligible work

What's common in Granada Hills homes

The oldest houses, from the 1910s to the 1930s, are in the southwest corner; most of the rest dates from the 1950s. Two neighborhoods add rules of their own.

  • 1950s tracts. Original 100-amp services, two-prong outlets and panel brands that inspectors flag are common in these houses.
  • Balboa Highlands Eichlers. Central atriums, floor-to-ceiling glass on the side and rear, steel sash, clerestory windows under exposed beams and rafters, and carports on many models. There's little wall space to hide a run and every exterior change is reviewed, so we route new circuits with the architecture rather than through it and keep equipment at the rear.
  • North of Rinaldi. Large semi-rural lots with barns, corrals, pumps and gates on long feeders, inside the fire zone. Wiring that crosses those lots is planned around the brush clearance and the animals.
  • Old Granada Hills and Knollwood. Lots of up to 20,000 square feet in Old Granada Hills and mid-century houses around the Knollwood golf course: pools, additions and second air-conditioning systems on services sized for none of them.

Permits and power in Granada Hills

Granada Hills (ZIP code 91344) runs from the Northridge line north to the county line in the Santa Susana Mountains, all of it City of Los Angeles. The local rule that matters is the Balboa Highlands Historic Preservation Overlay Zone. There, the city's rule of thumb is that every exterior alteration needs HPOZ approval, with the HPOZ planner consulted before applying at LADBS, and the district's preservation plan says electrical masts, headers and fuse boxes should be at the rear of the house, with mechanical equipment in the rear or side yard, out of view from the street. The plan also prefers utilities underground. Only houses inside the district boundary are covered, and we check the boundary before proposing anything.

That has to line up with LADWP, whose meter spot decides where a new service may go, so in Balboa Highlands we bring the preservation plan to the meter spot rather than finding out afterward. Lighting on facades not visible from the street is exempt from HPOZ review; a charger or a light on the street-facing wall is not.

North of Rinaldi Street, single-family lots in the Granada Hills Equinekeeping District carry barns that need their own building permit, and the hillside is in the Fire Department's Very High Fire Hazard Severity Zone, with brush cleared up to 200 feet from a structure.

Permits come from the Los Angeles Department of Building and Safety (LADBS). A new circuit, an EV charger, a sub-panel or a panel replacement is permitted work, and LADBS will not send an inspector until the permit is issued. We pull it under our license and meet the inspector at the end.

Power comes from the Los Angeles Department of Water and Power (LADWP), not Southern California Edison. For repairs, lighting, new outlets and a charger that fits on the existing panel, LADWP is not involved. For a panel or service upgrade it is: the job starts with LADWP's free meter spot, where an Electric Service Representative visits within five to fifteen business days, confirms where the new equipment may go and leaves a sketch at the job (single-family services up to 320 amps can be requested online). When only the meter needs setting, LADWP says that generally happens within ten working days. If the existing LADWP service can carry the new load there are generally no LADWP charges; work in the street, on a transformer or on the lines can add cost and time, and we find that out before you commit.

The permits and utilities guide explains the whole picture for the three counties we serve.

Around Granada Hills

Porter Ranch to the west, Northridge to the south, and Mission Hills and Sylmar to the east are City of Los Angeles neighborhoods with LADBS permits and LADWP power, as is Chatsworth a few minutes west. Over the Newhall Pass, Santa Clarita is a separate city, with permits from its own Building and Safety Division and power from Southern California Edison.

See the full list of areas we cover across Los Angeles, Orange and Ventura counties.

From our jobs

Panel upgrade with a new LADWP meter, labeled circuits and solar disconnect labeling
Panel upgrade with a new LADWP meter, labeled circuits and solar disconnect labeling
Panel replacement in progress: new meter main set and flashed, conduit run below
Panel replacement in progress: new meter main set and flashed, conduit run below
Sputnik chandelier and pendants over a dining area
Sputnik chandelier and pendants over a dining area
Original Zinsco panel with a rusted cover and hand-written labels
Original Zinsco panel with a rusted cover and hand-written labels

See more recent work

Simple from the first call

How a job runs.

No phone quotes and no guessing. A written estimate after we've seen the job, then permitted, inspected work.

STEP 01

Reach out

Call or send the form. A photo of the panel or the problem helps us come prepared.

STEP 02

On-site visit

We come to your home or business and look at the panel, wiring or site.

STEP 03

Written estimate

Scope, price and timeline in writing before you decide anything.

STEP 04

Permitted, inspected work

We pull the permit, coordinate your utility when needed, and finish with the inspection.

Questions people ask

We live in Balboa Highlands. Can we replace our panel?

Yes, but the location and the order of steps matter. Every exterior alteration in the HPOZ needs approval, the district's plan puts electrical masts, headers and fuse boxes at the rear of the house, and LADWP's meter spot has to agree with that location. The order matters: the HPOZ planner's sign-off first, then the LADWP meter spot, and only then the LADBS permit. We plan the job in that order so nothing sits waiting. Minor conforming work is often cleared quickly; significant changes can be under review for up to 75 days.

Can I put an EV charger on the outside of our Eichler?

On a wall that isn't visible from the street, usually yes, with a simple clearance; on the street-facing facade it's an exterior alteration the HPOZ will look at closely. Many Balboa Highlands houses have a carport rather than a garage, so we look first at the rear or side of the house and the carport's inner wall, and plan the location around what the HPOZ planner will ask for.

How do you add circuits in an Eichler without spoiling it?

By working with the structure. These houses have walls of glass, exposed beams and rafters, and few closed walls, so there are not many hidden paths for a new run. We use the paths that exist, keep anything that shows outside toward the rear, in line with the preservation plan, and if a re-roof is coming, that's the best moment to run new circuits overhead. We walk the house with you on the site visit and show you where each run would go before you decide.

Ready when you are.

Call now, or send the form and we'll call you back to schedule an on-site estimate.

Call (844) 430-7681Free estimate